Dolet Hills Substation (J4133)

Dolet Hills Substation is a 756.0 MW gas interconnection project in De Soto, Louisiana with a current status of withdrawn. It is proposed to connect at Dolet Hills Substation.

756.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameDolet Hills Substation
Queue IDJ4133
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity756.0 MW
StateLouisiana
CountyDe Soto
Point of interconnectionDolet Hills Substation
Requested (queue) date2025-10-03
Proposed in-service date2030-06-01
Operational date2030-06-01
Withdrawn date2026-04-15
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.