Dolomite Storage (25INR0495)
Dolomite Storage is a 125.7 MW other interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at 218 Rockett 69kV.
125.7 MWCapacity
OperationalStatus
EllisMarket
OtherTechnology
Project facts
| Canonical name | Dolomite Storage |
|---|---|
| Queue ID | 25INR0495 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Ellis |
| Technology | Other |
| Capacity | 125.7 MW |
| State | Texas |
| County | Ellis |
| Point of interconnection | 218 Rockett 69kV |
| Requested (queue) date | 2023-09-08 |
| Proposed in-service date | — |
| Operational date | 2026-12-01 |
| Withdrawn date | — |
| Developer | BT Wilson Storage, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.