Donald Nys Substation (L0592)

Donald Nys Substation is a 35.0 MW other interconnection project in Columbia, Washington with a current status of active. It is proposed to connect at Longview-Allston No. 4 115kV line.

35.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameDonald Nys Substation
Queue IDL0592
Statusactive
Source statusSTUDY COMPLETED
MarketWA
TechnologyOther
Capacity35.0 MW
StateWashington
CountyColumbia
Point of interconnectionLongview-Allston No. 4 115kV line
Requested (queue) date2024-03-11
Proposed in-service date2027-03-12
Operational date
Withdrawn date
DeveloperColumbia River People's Utility District
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.