Donna Solar (27INR0205)

Donna Solar is a 168.1 MW solar interconnection project in Hidalgo, Texas with a current status of operational. It is proposed to connect at Tap 345 kV (80137) Stewart Road - (8383) North Edinburg CKT ID#01.

168.1 MWCapacity
OperationalStatus
HidalgoMarket
SolarTechnology

Project facts

Canonical nameDonna Solar
Queue ID27INR0205
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHidalgo
TechnologySolar
Capacity168.1 MW
StateTexas
CountyHidalgo
Point of interconnectionTap 345 kV (80137) Stewart Road - (8383) North Edinburg CKT ID#01
Requested (queue) date2024-03-22
Proposed in-service date
Operational date2029-02-22
Withdrawn date
DeveloperDonna Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata