DOS AMIGOS SOLAR (1122)

DOS AMIGOS SOLAR is a 81.8 MW solar interconnection project in Merced, California with a current status of withdrawn. It is proposed to connect at Mercy Springs 70 kV Switching Station.

81.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameDOS AMIGOS SOLAR
Queue ID1122
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity81.8 MW
StateCalifornia
CountyMerced
Point of interconnectionMercy Springs 70 kV Switching Station
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2017-05-03
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.