Double Creek (67043_BAT1)

Double Creek is a 5.0 MW battery interconnection project in Stokes, North Carolina with a current status of operational.

5.0 MWCapacity
OperationalStatus
CPLEMarket
BatteryTechnology

Project facts

Canonical nameDouble Creek
Queue ID67043_BAT1
Statusoperational
Source status(OP) Operating
MarketCPLE
TechnologyBattery
Capacity5.0 MW
StateNorth Carolina
CountyStokes
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-12-01
Withdrawn date
Developer
Utility / transmission ownerNorth Carolina El Member Corp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata