Douglas Woods Wind Units 1-11 (328)
Douglas Woods Wind Units 1-11 is a 27.5 MW wind interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at GRID 69 kV S19 at E. Webster Substation.
27.5 MWCapacity
WithdrawnStatus
WMAMarket
WindTechnology
Project facts
| Canonical name | Douglas Woods Wind Units 1-11 |
|---|---|
| Queue ID | 328 |
| Status | withdrawn |
| Source status | W |
| Market | WMA |
| Technology | Wind |
| Capacity | 27.5 MW |
| State | Massachusetts |
| County | Worcester |
| Point of interconnection | GRID 69 kV S19 at E. Webster Substation |
| Requested (queue) date | 2010-05-06 |
| Proposed in-service date | 2014-10-01 |
| Operational date | — |
| Withdrawn date | 2013-09-05 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata