Dover 12kV (AA1-091)

Dover 12kV is a 2.0 MW battery interconnection project in Kent, Delaware with a current status of withdrawn.

2.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameDover 12kV
Queue IDAA1-091
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity2.0 MW
StateDelaware
CountyKent
Point of interconnection—
Requested (queue) date2014-10-29
Proposed in-service date2015-11-01
Operational date—
Withdrawn date2015-03-06
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata