DOVER NY BESS (C24-316)

DOVER NY BESS is a 1,000.0 MW battery interconnection project in Dutchess, New York with a current status of withdrawn. It is proposed to connect at Pleasant Valley-Cricket Valley 345kV.

1,000.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameDOVER NY BESS
Queue IDC24-316
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity1,000.0 MW
StateNew York
CountyDutchess
Point of interconnectionPleasant Valley-Cricket Valley 345kV
Requested (queue) date2024-10-03
Proposed in-service date
Operational date
Withdrawn date
DeveloperDOVER PLAINS ENERGY PROPERTIES LLC
Utility / transmission ownerCONED

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.