Draco Solar (27INR0499)
Draco Solar is a 500.0 MW solar interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2.
500.0 MWCapacity
OperationalStatus
BordenMarket
SolarTechnology
Project facts
| Canonical name | Draco Solar |
|---|---|
| Queue ID | 27INR0499 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Borden |
| Technology | Solar |
| Capacity | 500.0 MW |
| State | Texas |
| County | Borden |
| Point of interconnection | Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2 |
| Requested (queue) date | 2025-04-21 |
| Proposed in-service date | — |
| Operational date | 2027-08-19 |
| Withdrawn date | — |
| Developer | Draco Solar LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata