Dry Land Prairie Energy Storage (70137_DL250)

Dry Land Prairie Energy Storage is a 250.0 MW battery interconnection project in Cheyenne, Colorado with a current status of active.

250.0 MWCapacity
ActiveStatus
PSCOMarket
BatteryTechnology

Project facts

Canonical nameDry Land Prairie Energy Storage
Queue ID70137_DL250
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketPSCO
TechnologyBattery
Capacity250.0 MW
StateColorado
CountyCheyenne
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDry Land Prairie Energy Storage, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata