Dubois - Culley 138kV line (S1026)

Dubois - Culley 138kV line is a 50.0 MW generation interconnection project in Dubois, Indiana with a current status of operational. It is proposed to connect at Dubois - Culley 138kV line.

50.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameDubois - Culley 138kV line
Queue IDS1026
Statusoperational
Source statusActive
Market
TechnologyGeneration
Capacity50.0 MW
StateIndiana
CountyDubois
Point of interconnectionDubois - Culley 138kV line
Requested (queue) date2022-05-26
Proposed in-service date2022-07-01
Operational date2022-07-01
Withdrawn date
Developer
Utility / transmission ownerSouthern Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata