Duke Energy Progress LLC (962925)
Duke Energy Progress LLC is a 145.0 MW solar interconnection project in Lee, South Carolina with a current status of active. It is proposed to connect at ROBINSON PLANT - SUMTER 230KV.
145.0 MWCapacity
ActiveStatus
SCMarket
SolarTechnology
Project facts
| Canonical name | Duke Energy Progress LLC |
|---|---|
| Queue ID | 962925 |
| Status | active |
| Source status | Facility Study |
| Market | SC |
| Technology | Solar |
| Capacity | 145.0 MW |
| State | South Carolina |
| County | Lee |
| Point of interconnection | ROBINSON PLANT - SUMTER 230KV |
| Requested (queue) date | 2024-09-26 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Duke Energy Florida, LLC |
| Utility / transmission owner | Duke Energy Progress |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-24 | poi_name | Robinson Plant - Sumter 230kV | ROBINSON PLANT - SUMTER 230KV | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: duke-dep-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.