Dunkel BESS (23INR0310)

Dunkel BESS is a 226.3 MW other interconnection project in Lubbock, Texas with a current status of operational. It is proposed to connect at 59156 Yellow House Canyon 115kV.

226.3 MWCapacity
OperationalStatus
LubbockMarket
OtherTechnology

Project facts

Canonical nameDunkel BESS
Queue ID23INR0310
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketLubbock
TechnologyOther
Capacity226.3 MW
StateTexas
CountyLubbock
Point of interconnection59156 Yellow House Canyon 115kV
Requested (queue) date2022-06-27
Proposed in-service date
Operational date2027-11-02
Withdrawn date
DeveloperMomentum Energy Storage Partners,LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.