E Babe Smith Solar is a 7.6 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at Station Name: E BABE SMITH_x000D_ Station Code: EBABES_x000D_ PTI BUS#: 7060_x000D_ Load/Load TR Name: T1_x000D_ kV level: 138 kV.
Project facts
| Canonical name | E Babe Smith Solar |
|---|---|
| Queue ID | 24INR0719 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 7.6 MW |
| State | — |
| County | — |
| Point of interconnection | Station Name: E BABE SMITH_x000D_ Station Code: EBABES_x000D_ PTI BUS#: 7060_x000D_ Load/Load TR Name: T1_x000D_ kV level: 138 kV |
| Requested (queue) date | 2024-04-12 |
| Proposed in-service date | 2024-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Hwy 183 Solar LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata