EAST ALTAMONT ENERGY CENTER (377)

EAST ALTAMONT ENERGY CENTER is a 600.0 MW gas interconnection project in Alameda, California with a current status of withdrawn. It is proposed to connect at Tracy Substation 230 kV.

600.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameEAST ALTAMONT ENERGY CENTER
Queue ID377
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity600.0 MW
StateCalifornia
CountyAlameda
Point of interconnectionTracy Substation 230 kV
Requested (queue) date2008-05-28
Proposed in-service date
Operational date
Withdrawn date2008-11-26
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata