EAST ALTAMONT ENERGY CENTER - OPTION 2 (46)

EAST ALTAMONT ENERGY CENTER - OPTION 2 is a 531.0 MW gas interconnection project in Contra Costa, California with a current status of withdrawn. It is proposed to connect at Tesla-Tracy #1 230 kV Line - Tracy Sub.

531.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameEAST ALTAMONT ENERGY CENTER - OPTION 2
Queue ID46
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity531.0 MW
StateCalifornia
CountyContra Costa
Point of interconnectionTesla-Tracy #1 230 kV Line - Tracy Sub
Requested (queue) date2004-12-01
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata