East Blackland Battery Storage SLF (25INR0266)

East Blackland Battery Storage SLF is a 75.0 MW other interconnection project in Travis, Texas with a current status of operational. It is proposed to connect at 7337 Kimbro 138kV.

75.0 MWCapacity
OperationalStatus
TravisMarket
OtherTechnology

Project facts

Canonical nameEast Blackland Battery Storage SLF
Queue ID25INR0266
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketTravis
TechnologyOther
Capacity75.0 MW
StateTexas
CountyTravis
Point of interconnection7337 Kimbro 138kV
Requested (queue) date2022-11-23
Proposed in-service date
Operational date2028-05-27
Withdrawn date
DeveloperDeriva Energy
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata