East Blackland Solar Project 1 (57659_PSF)

East Blackland Solar Project 1 is a 144.0 MW solar interconnection project in Travis, Texas with a current status of operational.

144.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameEast Blackland Solar Project 1
Queue ID57659_PSF
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity144.0 MW
StateTexas
CountyTravis
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2021-07-01
Withdrawn date
Developer
Utility / transmission ownerDeriva Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata