East Flemington-Lebanon 34.5 kV (AD2-213)

East Flemington-Lebanon 34.5 kV is a 20.0 MW battery interconnection project in Hunterdon, New Jersey with a current status of operational.

20.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameEast Flemington-Lebanon 34.5 kV
Queue IDAD2-213
Statusoperational
Source statusIn Service
Market
TechnologyBattery
Capacity20.0 MW
StateNew Jersey
CountyHunterdon
Point of interconnection
Requested (queue) date2018-04-01
Proposed in-service date
Operational date2023-07-14
Withdrawn date
Developer
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.