East Hampton - Phase 3 (0435)

East Hampton - Phase 3 is a 20.0 MW solar interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at Amagansett Substation 69KV.

20.0 MWCapacity
WithdrawnStatus
KMarket
SolarTechnology

Project facts

Canonical nameEast Hampton - Phase 3
Queue ID0435
Statuswithdrawn
Source status0
MarketK
TechnologySolar
Capacity20.0 MW
StateNew York
CountySuffolk
Point of interconnectionAmagansett Substation 69KV
Requested (queue) date2014-04-21
Proposed in-service date2014-05-31
Operational date
Withdrawn date
DeveloperEast Hampton Solar Farm 2, LLC
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata