East Longmeadow substation - NG Western MA Area Cluster Study (853)

East Longmeadow substation - NG Western MA Area Cluster Study is a 9.0 MW solar interconnection project in Hampden, Massachusetts with a current status of withdrawn. It is proposed to connect at NG East Longmeadow.

9.0 MWCapacity
WithdrawnStatus
WMAMarket
SolarTechnology

Project facts

Canonical nameEast Longmeadow substation - NG Western MA Area Cluster Study
Queue ID853
Statuswithdrawn
Source statusW
MarketWMA
TechnologySolar
Capacity9.0 MW
StateMassachusetts
CountyHampden
Point of interconnectionNG East Longmeadow
Requested (queue) date2019-03-21
Proposed in-service date2022-08-07
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata