East Low 47.5 Pump Project (L0492)

East Low 47.5 Pump Project is a 5.2 MW other interconnection project in Adams, Washington with a current status of active. It is proposed to connect at BBEC's Schrag Substation.

5.2 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameEast Low 47.5 Pump Project
Queue IDL0492
Statusactive
Source statusCONST AGRMT EXE
MarketWA
TechnologyOther
Capacity5.2 MW
StateWashington
CountyAdams
Point of interconnectionBBEC's Schrag Substation
Requested (queue) date2021-06-29
Proposed in-service date2024-06-25
Operational date
Withdrawn date
DeveloperUSBR Columbia Basin
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata