USBR Columbia Basin — Interconnection Portfolio
USBR Columbia Basin is associated with 2 tracked interconnection projects representing 10 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
2Projects
1Active
1Operational
0Withdrawn
10 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 10 MW |
Geographic footprint
| State | Projects |
|---|---|
| Washington | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| East Low 47.5 Pump Project | L0492 | Other | 5.2 MW | active | Adams, Washington |
| East Low 79.2 Pump Project | L0500 | Other | 4.5 MW | operational | Franklin, Washington |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.