East Low 79.2 Pump Project (L0500)

East Low 79.2 Pump Project is a 4.5 MW other interconnection project in Franklin, Washington with a current status of operational. It is proposed to connect at Scooteney Substation.

4.5 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameEast Low 79.2 Pump Project
Queue IDL0500
Statusoperational
Source statusBPA COMPLETED
MarketWA
TechnologyOther
Capacity4.5 MW
StateWashington
CountyFranklin
Point of interconnectionScooteney Substation
Requested (queue) date2021-08-17
Proposed in-service date
Operational date2024-08-13
Withdrawn date
DeveloperUSBR Columbia Basin
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.