East Low 79.2 Pump Project (L0500)
East Low 79.2 Pump Project is a 4.5 MW other interconnection project in Franklin, Washington with a current status of operational. It is proposed to connect at Scooteney Substation.
4.5 MWCapacity
OperationalStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | East Low 79.2 Pump Project |
|---|---|
| Queue ID | L0500 |
| Status | operational |
| Source status | BPA COMPLETED |
| Market | WA |
| Technology | Other |
| Capacity | 4.5 MW |
| State | Washington |
| County | Franklin |
| Point of interconnection | Scooteney Substation |
| Requested (queue) date | 2021-08-17 |
| Proposed in-service date | — |
| Operational date | 2024-08-13 |
| Withdrawn date | — |
| Developer | USBR Columbia Basin |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata