East Quincy-Fishhook 138kV (J2258)

East Quincy-Fishhook 138kV is a 175.0 MW solar interconnection project in Adams, Illinois with a current status of operational. It is proposed to connect at East Quincy-Fishhook 138kV.

175.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameEast Quincy-Fishhook 138kV
Queue IDJ2258
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity175.0 MW
StateIllinois
CountyAdams
Point of interconnectionEast Quincy-Fishhook 138kV
Requested (queue) date2022-03-28
Proposed in-service date2024-05-31
Operational date2024-05-31
Withdrawn date
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.