East Towanda-Grover 230kV (U2-016)

East Towanda-Grover 230kV is a 85.0 MW wind interconnection project in Bradford, Pennsylvania with a current status of withdrawn.

85.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameEast Towanda-Grover 230kV
Queue IDU2-016
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity85.0 MW
StatePennsylvania
CountyBradford
Point of interconnection
Requested (queue) date2008-05-23
Proposed in-service date2011-10-01
Operational date
Withdrawn date2012-01-13
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.