Eastside WWTP (57606_3)

Eastside WWTP is a 1.8 MW other interconnection project in Guilford, North Carolina with a current status of operational.

1.8 MWCapacity
OperationalStatus
DUKMarket
OtherTechnology

Project facts

Canonical nameEastside WWTP
Queue ID57606_3
Statusoperational
Source status(OP) Operating
MarketDUK
TechnologyOther
Capacity1.8 MW
StateNorth Carolina
CountyGuilford
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2004-08-01
Withdrawn date—
Developer—
Utility / transmission ownerCity Of High Point - (NC)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata