Eau Claire - Arpin 345kV (J2018)

Eau Claire - Arpin 345kV is a 190.0 MW solar interconnection project in Clark, Wisconsin with a current status of withdrawn. It is proposed to connect at Eau Claire - Arpin 345kV.

190.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEau Claire - Arpin 345kV
Queue IDJ2018
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity190.0 MW
StateWisconsin
CountyClark
Point of interconnectionEau Claire - Arpin 345kV
Requested (queue) date2021-11-23
Proposed in-service date2026-10-01
Operational date2026-10-01
Withdrawn date2023-10-10
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.