Clark County, Wisconsin — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Clark, Wisconsin, representing 810 MW of requested capacity.
7Total projects
1Active
2Operational
4Withdrawn
810 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 515 MW |
| Solar | 3 | 194 MW |
| Battery | 1 | 100 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Stonelake to Gardner Park 345kV | J1631 | Wind | 200.0 MW | withdrawn | Clark, Wisconsin |
| Stone Lake - Gardner Park 345.0kV | J3204 | Wind | 190.0 MW | operational | Clark, Wisconsin |
| Eau Claire - Arpin 345kV | J2018 | Solar | 190.0 MW | withdrawn | Clark, Wisconsin |
| T Corners 115kV Sub | J1866 | Wind | 125.0 MW | withdrawn | Clark, Wisconsin |
| Eau Claire - Arpin 345kV | J2014 | Battery | 100.0 MW | withdrawn | Clark, Wisconsin |
| Clark Solar-Longwood | 69933_CLARK | Solar | 2.5 MW | active | Clark, Wisconsin |
| Popple Creek (Clark 1) | 66995_715 | Solar | 2.0 MW | operational | Clark, Wisconsin |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.