Ebersole #2-Fostoria Central 138 kV (AE1-146)

Ebersole #2-Fostoria Central 138 kV is a 120.0 MW solar interconnection project in Hancock, Ohio with a current status of operational.

120.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical nameEbersole #2-Fostoria Central 138 kV
Queue IDAE1-146
Statusoperational
Source statusPartially in Service - Under Construction
Market—
TechnologySolar
Capacity120.0 MW
StateOhio
CountyHancock
Point of interconnection—
Requested (queue) date2018-09-25
Proposed in-service date—
Operational date2026-12-31
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-25statusactiveoperationalhigh
2026-09-25proposed_online_date2026-12-31—medium
2026-09-25operational_date—2026-12-31medium
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata