EC250W Project (LG-18-3-1)
EC250W Project is a 250.0 MW wind interconnection project in Eddy, New Mexico with a current status of withdrawn. It is proposed to connect at Eddy County DC Tie Substaton.
250.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | EC250W Project |
|---|---|
| Queue ID | LG-18-3-1 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 250.0 MW |
| State | New Mexico |
| County | Eddy |
| Point of interconnection | Eddy County DC Tie Substaton |
| Requested (queue) date | 2018-03-29 |
| Proposed in-service date | 2020-09-01 |
| Operational date | — |
| Withdrawn date | 2018-11-09 |
| Developer | — |
| Utility / transmission owner | El Paso Electric Company |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.