Eddy County, New Mexico — Interconnection Projects
The interXdata warehouse tracks 14 interconnection projects in Eddy, New Mexico, representing 1,828 MW of requested capacity.
14Total projects
0Active
4Operational
10Withdrawn
1,828 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 5 | 788 MW |
| Solar | 7 | 560 MW |
| Wind | 1 | 250 MW |
| Other | 1 | 230 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| EC250W Project | LG-18-3-1 | Wind | 250.0 MW | withdrawn | Eddy, New Mexico |
| Kiowa Substation 115kV (90753) | GEN-2018-075 | Other | 230.0 MW | withdrawn | Eddy, New Mexico |
| Phantom 3 115 kV Substation | GEN-2024-147 | Solar | 200.3 MW | withdrawn | Eddy, New Mexico |
| Phantom 115 kV Substation | GEN-2023-184 | Solar | 200.0 MW | withdrawn | Eddy, New Mexico |
| North Loving 115 kV Substation | GEN-2024-246 | Battery | 199.0 MW | withdrawn | Eddy, New Mexico |
| China Draw 345 kV Substation | GEN-2024-347 | Battery | 199.0 MW | withdrawn | Eddy, New Mexico |
| Pecos Interchange 115 kV Substation | GEN-2022-128 | Battery | 150.0 MW | withdrawn | Eddy, New Mexico |
| Atoka 115 kV Substation | GEN-2024-251 | Battery | 125.0 MW | withdrawn | Eddy, New Mexico |
| S Loving 115 kV Substation | GEN-2024-295 | Battery | 115.0 MW | operational | Eddy, New Mexico |
| Tap Potash Junction - Livingston Ridge 115kV | GEN-2014-069 | Solar | 90.0 MW | withdrawn | Eddy, New Mexico |
| Chevron Green 115 kV Substation | ASGI-2023-001 | Solar | 20.0 MW | operational | Eddy, New Mexico |
| Chevron Green 115 kV Substation | GEN-2023-187 | Solar | 20.0 MW | withdrawn | Eddy, New Mexico |
| Hayhurst New Mexico Solar | 66412_HHNM | Solar | 20.0 MW | operational | Eddy, New Mexico |
| SPS5 Hopi | 57740_1 | Solar | 10.1 MW | operational | Eddy, New Mexico |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.