Echols Grove Solar (25INR0368)
Echols Grove Solar is a 201.6 MW solar interconnection project in Lamar, Texas with a current status of operational. It is proposed to connect at Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770).
201.6 MWCapacity
OperationalStatus
LamarMarket
SolarTechnology
Project facts
| Canonical name | Echols Grove Solar |
|---|---|
| Queue ID | 25INR0368 |
| Status | operational |
| Source status | SS Completed, FIS Completed, IA |
| Market | Lamar |
| Technology | Solar |
| Capacity | 201.6 MW |
| State | Texas |
| County | Lamar |
| Point of interconnection | Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770) |
| Requested (queue) date | 2023-04-07 |
| Proposed in-service date | — |
| Operational date | 2027-04-03 |
| Withdrawn date | — |
| Developer | Echols Grove, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata