Eddystone (U1-013)

Eddystone is a 630.0 MW gas interconnection project in Delaware, Pennsylvania with a current status of withdrawn.

630.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameEddystone
Queue IDU1-013
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity630.0 MW
StatePennsylvania
CountyDelaware
Point of interconnection
Requested (queue) date2008-02-07
Proposed in-service date2013-01-01
Operational date
Withdrawn date2009-10-14
Developer
Utility / transmission ownerPECO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.