Edgeley 115kV substation is a 72.0 MW solar interconnection project in LaMoure, North Dakota with a current status of withdrawn. It is proposed to connect at Edgeley 115kV substation.

72.0 MWCapacity
WithdrawnStatus
NDMarket
SolarTechnology

Project facts

Canonical nameEdgeley 115kV substation
Queue IDGEN-2018-039
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologySolar
Capacity72.0 MW
StateNorth Dakota
CountyLaMoure
Point of interconnectionEdgeley 115kV substation
Requested (queue) date2018-05-29
Proposed in-service date2028-12-31
Operational date
Withdrawn date2024-03-05
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata