Edgewater Storage (21INR0280)

Edgewater Storage is a 50.0 MW other interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at 210 Reagor Springs 69kV .

50.0 MWCapacity
OperationalStatus
EllisMarket
OtherTechnology

Project facts

Canonical nameEdgewater Storage
Queue ID21INR0280
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketEllis
TechnologyOther
Capacity50.0 MW
StateTexas
CountyEllis
Point of interconnection210 Reagor Springs 69kV
Requested (queue) date2019-04-08
Proposed in-service date
Operational date2028-02-29
Withdrawn date
DeveloperEdgewater Battery Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.