Edinboro South-Erie South 25kV (AH1-331 - moved to TC2)

Edinboro South-Erie South 25kV is a 19.9 MW solar interconnection project in Erie, Pennsylvania with a current status of withdrawn.

19.9 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameEdinboro South-Erie South 25kV
Queue IDAH1-331 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity19.9 MW
StatePennsylvania
CountyErie
Point of interconnection—
Requested (queue) date2021-09-09
Proposed in-service date2023-06-01
Operational date—
Withdrawn date2025-07-03
Developer—
Utility / transmission ownerPENELEC

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata