Edinboro South-Venango Junction 115 kV III (AH1-474)

Edinboro South-Venango Junction 115 kV III is a 87.0 MW battery interconnection project in Crawford, Pennsylvania with a current status of withdrawn.

87.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameEdinboro South-Venango Junction 115 kV III
Queue IDAH1-474
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity87.0 MW
StatePennsylvania
CountyCrawford
Point of interconnection—
Requested (queue) date2021-09-11
Proposed in-service date2023-09-25
Operational date—
Withdrawn date2024-12-18
Developer—
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.