Edison-Gravel Pit 138 kV (AF1-158)

Edison-Gravel Pit 138 kV is a 150.0 MW solar interconnection project in St. Joseph, Indiana with a current status of operational.

150.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameEdison-Gravel Pit 138 kV
Queue IDAF1-158
Statusoperational
Source statusIn Service
Market
TechnologySolar
Capacity150.0 MW
StateIndiana
CountySt. Joseph
Point of interconnection
Requested (queue) date2019-09-24
Proposed in-service date
Operational date2025-01-31
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.