EE CT DER Group Study (1536)

EE CT DER Group Study is a 3.7 MW solar interconnection project in Litchfield, Connecticut with a current status of withdrawn. It is proposed to connect at EE WINSTED 33B/CAMPVILLE.

3.7 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology

Project facts

Canonical nameEE CT DER Group Study
Queue ID1536
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar
Capacity3.7 MW
StateConnecticut
CountyLitchfield
Point of interconnectionEE WINSTED 33B/CAMPVILLE
Requested (queue) date2024-05-15
Proposed in-service date2024-07-01
Operational date
Withdrawn date2024-05-29
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.