EE CT DER Group Study (1538)

EE CT DER Group Study is a 5.0 MW battery interconnection project in New London, Connecticut with a current status of withdrawn. It is proposed to connect at EE Flanders 11Y.

5.0 MWCapacity
WithdrawnStatus
CTMarket
BatteryTechnology

Project facts

Canonical nameEE CT DER Group Study
Queue ID1538
Statuswithdrawn
Source statusW
MarketCT
TechnologyBattery
Capacity5.0 MW
StateConnecticut
CountyNew London
Point of interconnectionEE Flanders 11Y
Requested (queue) date2024-05-15
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.