EE Group @ Southwick (1405)

EE Group @ Southwick is a 7.0 MW solar+battery interconnection project in Hampden, Massachusetts with a current status of withdrawn. It is proposed to connect at EE SOUTHWICK 29A.

7.0 MWCapacity
WithdrawnStatus
WMAMarket
Solar+BatteryTechnology

Project facts

Canonical nameEE Group @ Southwick
Queue ID1405
Statuswithdrawn
Source statusW
MarketWMA
TechnologySolar+Battery
Capacity7.0 MW
StateMassachusetts
CountyHampden
Point of interconnectionEE SOUTHWICK 29A
Requested (queue) date2023-06-13
Proposed in-service date2024-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata