EK Tipton Solar 1 is a 20.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at 6673 Musquiz 138kV.

20.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameEK Tipton Solar 1
Queue ID21INR0388
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity20.0 MW
State
County
Point of interconnection6673 Musquiz 138kV
Requested (queue) date2019-07-08
Proposed in-service date2021-05-31
Operational date
Withdrawn date2019-07-08
DeveloperEnergiekontor US Texas SP 16 LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata