EL CAJON ENERGY CENTER 2 (958)

EL CAJON ENERGY CENTER 2 is a 49.9 MW gas interconnection project in San Diego, California with a current status of withdrawn. It is proposed to connect at 69kV bus of the El Cajon Sub.

49.9 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameEL CAJON ENERGY CENTER 2
Queue ID958
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity49.9 MW
StateCalifornia
CountySan Diego
Point of interconnection69kV bus of the El Cajon Sub
Requested (queue) date2013-04-30
Proposed in-service date
Operational date
Withdrawn date2013-07-01
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.