El Centro Hybrid (389_RICE4)

El Centro Hybrid is a 18.8 MW gas interconnection project in Imperial, California with a current status of active.

18.8 MWCapacity
ActiveStatus
IIDMarket
GasTechnology

Project facts

Canonical nameEl Centro Hybrid
Queue ID389_RICE4
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketIID
TechnologyGas
Capacity18.8 MW
StateCalifornia
CountyImperial
Point of interconnection
Requested (queue) date
Proposed in-service date2029-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerImperial Irrigation District

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.