El Dara Junction - Pittsfield 69 kV Line Tap (J1066)

El Dara Junction - Pittsfield 69 kV Line Tap is a 44.0 MW wind interconnection project in Pike County, Illinois with a current status of withdrawn. It is proposed to connect at El Dara Junction - Pittsfield 69 kV Line Tap.

44.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameEl Dara Junction - Pittsfield 69 kV Line Tap
Queue IDJ1066
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity44.0 MW
StateIllinois
CountyPike County
Point of interconnectionEl Dara Junction - Pittsfield 69 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2019-07-31
Operational date2019-07-31
Withdrawn date2018-05-17
Developer
Utility / transmission ownerPRAIRIE POWER, INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata