El Dorado 500kV Substation (J1872)

El Dorado 500kV Substation is a 250.0 MW solar interconnection project in Union, Arkansas with a current status of operational. It is proposed to connect at El Dorado 500kV Substation.

250.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameEl Dorado 500kV Substation
Queue IDJ1872
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity250.0 MW
StateArkansas
CountyUnion
Point of interconnectionEl Dorado 500kV Substation
Requested (queue) date2021-08-16
Proposed in-service date2024-09-15
Operational date2024-09-15
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.