El Dorado East - Sterlington 115 kV (J1499)

El Dorado East - Sterlington 115 kV is a 50.0 MW battery interconnection project in Union, Arkansas with a current status of withdrawn. It is proposed to connect at El Dorado East - Sterlington 115 kV.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameEl Dorado East - Sterlington 115 kV
Queue IDJ1499
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateArkansas
CountyUnion
Point of interconnectionEl Dorado East - Sterlington 115 kV
Requested (queue) date2020-06-08
Proposed in-service date2023-09-01
Operational date2023-09-01
Withdrawn date2023-02-10
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata