El Dorado EHV - Sarepta 345/115KV SW STA 345 kV (J3132)

El Dorado EHV - Sarepta 345/115KV SW STA 345 kV is a 150.0 MW battery interconnection project in Columbia, Arkansas with a current status of withdrawn. It is proposed to connect at El Dorado EHV - Sarepta 345/115KV SW STA 345 kV.

150.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameEl Dorado EHV - Sarepta 345/115KV SW STA 345 kV
Queue IDJ3132
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity150.0 MW
StateArkansas
CountyColumbia
Point of interconnectionEl Dorado EHV - Sarepta 345/115KV SW STA 345 kV
Requested (queue) date2022-09-14
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata